| NOTE: Torques: refer to ”General Specifications". |
| NOTE: Renew the O‐rings and lubricate with refrigerant oil. |
5. Install the components in reverse order.
6. Evacuate and fill the air conditioning system as described in Operation Number 34 620 0.
7. Check the operation of the air conditioning system.