ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Fluorescent Dye Leak Detection|Page 2529 > < Fluorescent Dye Leak Detection|Page 2527
Page 4
background image

-

Refrigerant system pressure should be between 413-551 kPa (60-80 psi) at 24°C.

1. Verify that the valves on the deluxe injector loop kit are closed.

2. Fill the deluxe injector loop kit reservoir with 7 ml (0.25 oz) of fluorescent dye.
3. Install the deluxe injector loop kit between high-pressure and low-pressure service gauge port valves.

4. CAUTION:  Make sure all tools and hoses are clear of the engine cooling fan drive belt before starting the engine.

Start the engine.

5. Open the high-pressure service valve.

6. Open the deluxe injector loop kit valves and inject the fluorescent dye into the refrigerant system.

Fluorescent Dye Leak Detection|Page 2529 > < Fluorescent Dye Leak Detection|Page 2527