Ranger 2WD L4-2.3L (2009)
7. Install the stop ring.
8. Fill the inboard CV joint housing with grease from the kit.
-
One-half of the grease must be installed in the joint and the remainder placed in the boot.
9. Position the CV housing on the CV joint.
10. Position the inboard halfshaft boot and clamp.
1. Position the boot in the housing groove.
2. Position the boot clamp.
11. Set the halfshaft assembled length to specifications. For additional information, refer to Specifications.
1. Measure the entire assembly length.
2. Push in or pull out on the inner joint as necessary to adjust the halfshaft assembled length.
3. Hold the inner joint to prevent the assembled length from changing and insert a small flat-blade screwdriver between the boot and the joint to
equalize the pressure.