ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Mini ISO Relay|Page 877 > < P1900 - P1904, ( P1901 P1902 P1903 1900 1901 1902 1903 1904 )|P1900|Page 869
Page 1
background image

Accessory Delay Relay: Testing and Inspection
Mini ISO Relay

Component Testing Instructions

Component testing procedures are provided to determine whether a component is good or bad.

Testing information for each component includes a schematic with component terminal locations and step-by-step test procedures. Component
terminals are identified by letters or numbers that may be marked on the component or callout if there is no mark on the component.

The component connector MUST BE REMOVED before testing. To test a single circuit within the component, select that circuit under the column
TO TEST. If you wish to test the complete component, perform all tests.

Connect the tester to the terminals shown in the second column and operate the component as shown in the third column.

Mini ISO Relay|Page 877 > < P1900 - P1904, ( P1901 P1902 P1903 1900 1901 1902 1903 1904 )|P1900|Page 869