Taurus FWD V6-3.5L (2008)
4. Connect the 3 LH fuel injector electrical connectors.
5. Attach all of the wiring harness retainers to the LH valve cover stud bolts.
6. Connect and attach the 2 engine control wiring harness electrical connectors.
7. Connect the LH VCT solenoid electrical connector.
8. Install the oil level indicator.
9. Install the LH ignition coils.