ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Variable Valve Timing > < Timing Cover|Specifications|Page 1927
Page 21
background image

34. Using new O-ring seals, connect the A/C tubes and install the 2 nuts.

^

Tighten to 15 Nm (11 lb-ft).

35. Install the degas bottle. 
36. Install the accessory drive belt, tensioner and the power steering belt. 
37. Install the front wheels and tires.
38. Install the engine air cleaner outlet pipe. 

39. CAUTION: Do not expose the Motorcraft High Performance Engine RTV Silicone to engine oil for at least 90 minutes after installing the

engine front cover. Failure to follow this instruction may cause oil leakage.

Fill the engine with clean engine oil.

40. Fill the power steering system. 
41. Recharge the A/C system. 

Variable Valve Timing > < Timing Cover|Specifications|Page 1927