ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 8015 > < Initial Inspection and Diagnostic Overview|Page 8013
Page 1
background image

Clock: Pinpoint Tests

PINPOINT TEST A: THE CLOCK OPERATION IS ERRATIC/INOPERATIVE

Normal Operation

The clock receives battery voltage from the smart junction box (SJB) through circuit SBP14 (BN/RD). Ground for the clock is supplied through
circuit GD111 (BK/BU).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

Clock

A1

A1-A2

Initial Inspection and Diagnostic Overview|Page 8015 > < Initial Inspection and Diagnostic Overview|Page 8013