freightliner Workshop Repair Guides

Freightliner Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 1891 > < Diagram Information and Instructions|Page 1889
Page 6
background image

5. Release the Secondary Terminal Lock, if required.
6. Position the connector locking finger away from the terminal using the proper special tool. Pull on the wire to remove the terminal from the

connector.

Installation

INSTALLATION

1. Insert the removed terminal in the same cavity on the repair connector.
2. Repeat steps for each terminal in the connector, being sure that all wires are inserted into the proper cavities. For additional connector pin-out

identification, refer to the wiring diagrams.

3. When the connector is re-assembled, the secondary terminal lock must be placed in the locked position to prevent terminal push out.
4. Replace dress cover (if applicable).
5. Connect connector to its mating half/component.
6. Connect battery and test all affected systems.

Removal

REMOVAL

1. Disconnect the battery.
2. Locate the diode in the harness, and remove the protective covering.
3. Remove the diode from the harness, pay attention to the current flow direction.

Installation

INSTALLATION

1. Remove the insulation from the wires in the harness. Only remove enough insulation to solder in the new diode.
2. Install the new diode in the harness, making sure current flow is correct. If necessary, refer to the appropriate wiring diagram for current flow.

Diagram Information and Instructions|Page 1891 > < Diagram Information and Instructions|Page 1889