geo Workshop Repair Guides

Geo Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 4393 > < Diagram Information and Instructions|Page 4391
Page 2
background image

Description

3. Inspect the Idle Speed Control (ISC) motor plunger. If ISC motor plunger is contacting throttle lever screw, then the engine must be brought to

operating temperature (refer to image).

4. Connect a Tech 1 scan tool to the Data Link Connector (DLC) and turn the ignition switch to "ON."

TPS Adjustment Metro W/ Upgraded Emissions

5. While observing TP sensor voltage on the Tech 1 scan tool, turn the TP sensor until the voltage reading is 0.98 to 1.02 volts (refer to image).

6. Tighten TP sensor screws to 2.0 Nm (18 lb in).

Diagram Information and Instructions|Page 4393 > < Diagram Information and Instructions|Page 4391