geo Workshop Repair Guides

Geo Workshop Service and Repair Manuals

Main Relay (Computer/Fuel System) > < Diagram Information and Instructions|Page 1794
Page 2
background image

REMOVE OR DISCONNECT

1. Negative (-) battery cable.
2. Two screws and left front speaker cover from Instrument Panel (I/P).
3. Two screws, left front speaker electrical connector and left front speaker from I/P.
4. Two bolts and ECM bracket from I/P support brace.
5. Two screws and fuse block from ECM bracket.
6. Two screws and ECM from ECM bracket.
7. Two ECM electrical connectors.

INSTALL OR CONNECT

^

Transfer old plastic shield to new ECM; secure with two screws (convertible models).

1. Two ECM electrical connectors.
2. ECM to ECM bracket; secure with two screws.
3. Fuse block to ECM bracket; secure with two screws.
4. ECM bracket to I/P support brace; secure with two bolts. Tighten ECM bracket-to-I/P support brace bolts to 20 Nm (15 lb. ft.).
5. Left front speaker electrical connector and left front speaker to I/P; secure with two screws.
6. Left front speaker cover to I/P; secure with two screws.
7. Negative (-) battery cable. Tighten negative (-) battery cable-to-negative (-) battery terminal retainer to 15 Nm (11 lb. ft.).

Main Relay (Computer/Fuel System) > < Diagram Information and Instructions|Page 1794