C 1500 Suburban 2WD V8-6.5L DSL Turbo VIN F (1997)
11. Install the vacuum hoses.
12. Install the heater hose bracket.
13. Install the EGR/Boost solenoids with the bracket to the intake manifold, studs.
14. Install the fuel line return hose.
15. Install the fuel filter and the bolts.
-
Tighten the bolts to 42 Nm (31 ft. lbs.).
16. Install the thermostat bolts.
17. Connect the negative battery cables.
18. Refill the engine coolant with the proper, quantity and type of coolant. Refer to Cooling System.