C 1500 Truck 2WD V8-5.3L VIN T (1999)
INSTALLATION PROCEDURE
IMPORTANT: Do not use RTV or any other type of sealant on the EBCM gasket or mating surfaces.
1. Install EBCM (2) onto BPMV (1).
2. Install the four EBCM bolts.
IMPORTANT: Do not reuse the old mounting bolts. Always install new bolts with the new BPMV.
-
Tighten the four bolts to 5 Nm (39 inch lbs.) in an X-pattern.
3. Connect the 2 way ABS pump motor connector to the EBCM.
4. Install BPMV (1) to BPMV bracket (3).
5. Install the BPMV to bracket retaining bolts (4).
-
Tighten the bolts to 9 Nm (7 ft. lbs.).
6. Install the EHCU (1, 2) to the vehicle frame (5).
-
Tighten the three EHCU bracket bolts (4) to 25 Nm (18 ft. lbs.).
7. Connect the two electrical harness connectors to the EBCM (1).
IMPORTANT: The brake pipes are held in the proper place by a frame mounted plastic bracket. Make sure that the brake pipes stay in the
correct place for proper reassembly.
8. Install the 5 brake pipes to the BPMV (6).
-
Tighten the brake pipe fittings to 30 Nm (22 ft. lbs.).
CAUTION: Refer to Battery Disconnect Caution in Service Precautions.