gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 10773 > < Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 10771
Page 46
background image

6. Slide the shock dampener (2) forward onto the rack.

Important:  Threads must be clean prior to Loctite application. Check Loctite, or equivalent, container for expiration date. Use only enough Loctite
to evenly coat threads.
If male rack and female inner tie rod (1) do not apply Loctite.

7. If female rack and male inner tie rod (1), apply Loctite 262, or equivalent, to the inner tie rod threads.
8. Attach the inner tie rod (1) onto the rack.

Notice:  Refer to Pipe Wrench Positioning Notice in Service Precautions.

9. Place a pipe wrench on the rack next to the inner tie rod housing (4).

10. Place a torque wrench and J 34028 on the flats of the inner tie rod housing (7).

^

Tighten the inner tie rod to 100 Nm (74 ft. lbs.). 

11. Place the inner tie rod assembly (2) in a vise.

Important:  If female rack (1) and male inner tie rod (2) do not stake. If male racket) and female inner tie rod (2) you must stake.

12. Stake both sides of the female inner tie rod assembly housing to the male rack.

Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 10773 > < Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 10771