gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

4L60-E Automatic Transmission|Page 6099 > < 4L60-E Automatic Transmission|Page 6097
Page 3
background image

11. Pull the cooler line straight out from the quick connect fitting.
12. Remove the retaining ring (E-clips) securing the cooler line to the quick connect in order to remove the remaining cooler lines from the remaining

quick connect fittings.

13. Remove the cooler lines from the vehicle.

INSTALLATION PROCEDURE 

1. Install the transmission oil cooler line to the vehicle.
2. Install a new retaining ring (E-clip) into the quick connect fitting using the following procedure:

IMPORTANT: 
-

Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. All retaining rings being installed
must be new.

-

Ensure the following procedures are performed when installing the new retaining rings onto the fittings.

3. Hook one of the open ends of the retaining ring in one of the slots in the quick connect fitting.

4. Rotate the retaining ring around the fitting until the retaining ring is positioned with all three ears through the three slots on the fitting.

4L60-E Automatic Transmission|Page 6099 > < 4L60-E Automatic Transmission|Page 6097