C 2500 3/4 Ton Pickup 2WD L6-292 4.8L VIN T 1-bbl (1982)
FIGURE 1 - CONVERTER BELT FLANGE
FIGURE 2 - CONVERTER BELT FLANGE
17.
Sift lower bed beads using procedure described in Step 8.
18.
Prop new converter up at a 45~ angle with lower bed fill hole at top. (See Figure 1 for definition of upper and lower beds.) Tap funnel J-34155-3
into converter fill hole with hammer (Figure 2).