gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Battery Cable Replacement (Positive)|Page 11005 > < Battery Cable Replacement (Positive)|Page 11003
Page 4
background image

1. Install the battery positive cable to the vehicle.
2. Install the battery positive cable to the starter solenoid stud.

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Install the starter solenoid nut.

Tighten
Tighten the starter solenoid nut to 9 N.m (80 lb in)

4. Install the battery positive cable in the retainer.
5. Install the battery positive cable bracket and nut.

Tighten
Tighten the battery cable retainer nut to 12 N.m (106 lb in)

Battery Cable Replacement (Positive)|Page 11005 > < Battery Cable Replacement (Positive)|Page 11003