C 2500 Truck 2WD V8-8.1L VIN G (2002)
21. Cut 26.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment harness.
22. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
23. Twist together 1 end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power
source until you are ready to deploy the side impact module.
24. Twist together 1 connector wire lead to 1 deployment wire.
25. Bend flat the twisted connection.
26. Secure and insulate the connection using electrical tape.7
27. Twist together, bend and tape the remaining connector wire lead to the remaining deployment wire.
28. Connect the deployment harness to the IP module connector.