gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Engine Compartment EVAP Pipe Removal Procedure|Page 6242 > < Engine Compartment EVAP Pipe Removal Procedure|Page 6240
Page 5
background image

1. Raise the vehicle. Refer to Lifting and Jacking the Vehicle.
2. Clean all of the EVAP pipe connections and the surrounding areas before disconnection in order to avoid possible contamination of the EVAP

system.

3. Disconnect the rear EVAP purge pipe (3) at the chassis EVAP purge pipe (2).
4. Disconnect the rear EVAP purge pipe at the EVAP canister (4).
5. Remove the rear EVAP purge pipe from the mounting clip (1).
6. Cap the chassis EVAP purge pipe and the EVAP canister in order to prevent possible EVAP system contamination.

Rear EVAP Purge Pipe Installation Procedure

1. Remove the caps from the chassis EVAP purge pipe and the EVAP canister.
2. Connect the rear EVAP purge pipe (3) at the EVAP canister (4).
3. Connect the rear EVAP purge pipe at the chassis EVAP purge pipe (2).
4. Install the rear EVAP purge pipe into the mounting clip (1).
5. Lower the vehicle.

EVAP Vent Pipe Removal Procedure

IMPORTANT:  When replacing the EVAP pipe, always replace the pipe with original equipment or parts that meet the GM specifications for this part.
The replacement pipe must have the same type of fittings as the original pipe in order to ensure the integrity of the connection.

1. Raise the vehicle. Refer to Lifting and Jacking the Vehicle.
2. Clean all the EVAP pipe connections and the surrounding areas before disconnecting in order to avoid possible contamination of the EVAP

system.

3. Disconnect the EVAP vent pipe (4) at the EVAP canister.
4. Disconnect the EVAP vent pipe at the EVAP vent valve (2).
5. Remove the EVAP vent pipe from the mounting clips (1).

Engine Compartment EVAP Pipe Removal Procedure|Page 6242 > < Engine Compartment EVAP Pipe Removal Procedure|Page 6240