C 3500 HD Truck 2WD V8-6.5L DSL Turbo VIN F (2001)
9. Install the heat shield between the turbocharger and the valve rocker arm cover.
Tighten the heat shield bolts to 6 Nm (53 inch lbs.).
10. Install the CDR valve to the valve rocker arm cover.
9. Install the heat shield between the turbocharger and the valve rocker arm cover.
Tighten the heat shield bolts to 6 Nm (53 inch lbs.).
10. Install the CDR valve to the valve rocker arm cover.