gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Intake Manifold Replacement - Left|Page 3816 > < Intake Manifold Replacement - Left
Page 2
background image

Important:  The left side and the right side intake manifolds are not interchangeable.

2. Install the intake manifold to the cylinder head.

Notice:  Refer to Fastener Notice in Service Precautions.

3. Install the intake manifold 9 bolts and 2 nuts.

-

Tighten the bolts and nuts to 21 Nm (15 ft. lbs.) in the sequence shown.

4. Install the intake manifold tube. 
5. Install the left fuel rail. 
6. Install the fuel junction block. 
7. Install the turbocharger.

Intake Manifold Replacement - Left|Page 3816 > < Intake Manifold Replacement - Left