gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Fuse Junction Block Replacement|Page 10630 > < Fuse Junction Block Replacement|Page 10628
Page 7
background image

6. Install the PCV hose to the upper valve rocker arm cover.

7. Install the water outlet tube using the following procedure:

7.1

Install a new O-ring seal on the water outlet tube.

7.2.

Lightly lubricate the O-ring seal with coolant.

7.3.

Install the water outlet tube.

7.4.

Install the bolt retaining the water outlet tube to the thermostat housing.

Tighten
Tighten the water outlet tube to thermostat housing bolt to 21 N.m (16 lb ft).

7.5.

Install the 2 bolts retaining the water outlet tube to the valve rocker arm cover.

Tighten
Tighten the water outlet tube to valve rocker arm cover bolts to 21 N.m (16 lb ft)

Fuse Junction Block Replacement|Page 10630 > < Fuse Junction Block Replacement|Page 10628