gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11163 > < Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11161
Page 14
background image

1. Install the new boot clamp (1) onto the rack and pinion boot (3).

2. Prior to rack and pinion boot installation, apply grease to the inner tie rod assembly (2) and the rack and pinion gear assembly (1).
3. Install the rack and pinion boot (3) onto the inner tie rod assembly (2).
4. If present, install the breather tube while aligning the breather tube with the mark made during removal and the molded nipple of the rack and

pinion boot.

Important:  The rack and pinion boot (3) must not be twisted, puckered or out of shape in any way. If the rack and pinion boot (3) is not shaped
properly, adjust the rack and pinion boot (3) by hand before installing the boot clamp.

5. Install the rack and pinion boot onto the gear assembly (1) until the rack and pinion boot (3) is seated in the gear assembly groove.

6. Install the boot clamp (1) on the rack and pinion boot (2) with J 22610.
7. Crimp the boot clamp (1).
8. Pinch the pliers together on the rack and pinion boot (2) in order to install the tie rod end clamp.

Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11163 > < Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11161