gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11176 > < Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11174
Page 27
background image

Install the check valve (1) using a 9.52 mm inch diameter piece of tubing 100 mm (4 inch) long to drive into the steering gear housing.

Steering Gear Cylinder Pipe Assemblies/O-Ring Seals Replacement - Off Vehicle (Quiet Valve)

Steering Gear Cylinder Pipe Assemblies/O-Ring Seals Replacement - Off Vehicle (Quiet Valve) 

Disassembly Procedure 

1. Loosen both cylinder line fittings on the cylinder end of the gear assembly.
2. Loosen both fittings on the cylinder line assemblies (1) at the valve end of the gear assembly.
3. Remove both cylinder line assemblies (1) from the rack and pinion gear assembly (2).

4. Remove the O-ring seals (1) from the valve end of line.
5. Discard the O-ring seals (1).

Assembly Procedure 

Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11176 > < Pitman Shaft Over-Center Preload Adjustment - Off Vehicle (700 Gear)|Page 11174