gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

4L60-E - Automatic Transmission|Page 7614 > < 4L60-E - Automatic Transmission|Page 7612
Page 3
background image

11. For vehicles equipped with an auxiliary oil cooler, remove the oil cooling lines from the frame rail. 

Installation Procedure

1. Install the transmission oil cooler line to the vehicle.

Important: 
^

Do not reuse any of the oil lines or oil line fittings if there is excessive corrosion.

^

Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. All retaining rings being installed must
be new.

^

Ensure the following procedures are performed when installing the new retaining rings onto the fittings.

2. Install a NEW retaining ring (E-clip) into the quick connect fitting using the following procedure:
3. Hook one of the open ends of the retaining ring in one of the slots in the quick connect fitting.

4. Rotate the retaining ring around the fitting until the retaining ring is positioned with all three ears through the three slots on the fitting.

4L60-E - Automatic Transmission|Page 7614 > < 4L60-E - Automatic Transmission|Page 7612