gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

4L60-E - Automatic Transmission|Page 8069 > < 4L60-E - Automatic Transmission|Page 8067
Page 5
background image

1. Route the cable through the hole in the floor panel. 
2. Install the cable to the clips on the transfer case, if equipped.
3. Install the two clips on the cable to the floor panel reinforcement.
4. Lower the vehicle.
5. Ensure that the steering column shift lever is in the park position.
6. Install the cable grommet to the floor panel.

7. Install the cable to the steering column bracket.

Ensure the tangs fully seat (snap) into the steering column bracket.

8. Install the retainer (2) securing the cable to the steering column.
9. Install the cable end (1) to the steering column ball stud.

10. Install the cable to the support.

4L60-E - Automatic Transmission|Page 8069 > < 4L60-E - Automatic Transmission|Page 8067