gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6706 > < Air Injection Vacuum Control Solenoid Valve|Locations|Page 6701
Page 1
background image

Air Injection Check Valve: Service and Repair
Secondary Air Injection Check Valve/Pipe Replacement - Bank 1

REMOVAL PROCEDURE

1. Remove the manifold pipe fastener from the fuel injection fuel rail stud.
2. Remove the manifold pipe fasteners from the exhaust manifold.
3. Disconnect the manifold pipe from the crossover pipe.
4. Remove the manifold pipe/check valve as an assembly.
5. Remove the check valve from the manifold pipe.

INSTALLATION PROCEDURE

1. Install the check valve to the manifold pipe.
2. Install the manifold pipe/check valve as an assembly to the crossover pipe.

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Install the manifold pipe fasteners to the exhaust manifold.

Tighten
Tighten the fasteners to 25 N.m (18 lb ft).

4. Install the manifold pipe fastener to the fuel injection fuel rail stud.

Tighten
Tighten the fasteners to 12 N.m (106 lb in).

Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6706 > < Air Injection Vacuum Control Solenoid Valve|Locations|Page 6701