Canyon 2WD L5-3.7L (2007)
7. Plug weld cross sill to the sill extension.
8. Clean and prepare all welded surfaces.
9. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair.
10. Paint and repair the area. Refer to Basecoat/Clearcoat Paint Systems.
11. Install all related panels and components.
12. Install the box assembly.