Canyon 2WD L5-3.7L (2007)
1. Position the NEW solenoid plate on the BPMV.
2. Install the new O-rings on the EBCM.
3. Install the BPMV to the EBCM.
1. Position the NEW solenoid plate on the BPMV.
2. Install the new O-rings on the EBCM.
3. Install the BPMV to the EBCM.