Canyon 2WD L5-3.7L (2007)
40. Twist together the 2 connector wire leads from the high circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
41. Inspect that the 3-wire connection is secure.
42. Bend flat the twisted connection.
43. Secure and insulate the 3-wire connection to the deployment harness using electrical tape.
44. Twist together the 2 connector wire leads from the low circuits from both stages of the I/P module to one set of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
45. Inspect that the 3-wire connection is secure.
46. Bend flat the twisted connection.