Envoy 2WD V6-4.3L VIN W (1998)
7. Disconnect the front cable.
INSTALLATION PROCEDURE
1. Install the front cable.
2. Connect the retainer and the grommet. All retaining fingers must be completely through the hole.
3. Connect the cable to the lever.
4. Install the left side sound insulator panel. Refer to Instrument Panel Sound Insulator Replacement.