gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Fluid Pan, A/T > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 6791
Page 6
background image

18. If you cannot position the plastic cap against the fitting, remove the retaining ring from the quick connect fitting per Step 5 of the cooler line

removal procedure. Check the retaining ring and the tube end in order to ensure neither is bent. Replace the cooler line or the retaining ring if
necessary, and reinstall per Step 2 of the cooler line installation procedure.

19. Install the cooler line into the quick connect fitting again in order to install the remaining cooler lines into the remaining quick connect fittings.

20. Install the flair nuts securing the oil cooler lines to the radiator.

^

Tighten the flair nuts to 45 Nm (33 ft. lbs.). 

21. Install the engine or transmission cooler lines to the frame.

Fluid Pan, A/T > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 6791