gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Procedures|Page 15975 > < Procedures|Page 15973
Page 7
background image

21. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used for the seat belt

pretensioner deployment harness.

22. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
23. Twist together one end from each of the wires in order to short the wires. The deployment wires are to remain shorted, and not connected to a

power source until you are ready to deploy the seat belt pretensioner.

24. Twist together one connector wire lead to one deployment wire.
25. Inspect that the previous connection is secure.

26. Bend flat the twisted connection.
27. Secure and insulate the connection using electrical tape.

28. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.

29. Connect the deployment harness to the seat belt pretensioner connector.

Procedures|Page 15975 > < Procedures|Page 15973