Envoy 4WD V8-5.3L VIN M (2005)
10. Torque all four bolts to 25 N.m (18 ft.lb).
11. Clean and prepare all bare-metal surfaces.
12. Apply a full-bodied caulk around the service hinge.
13. Refinish as necessary.
14. Install and align all of the related panels and components.