gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Engine - Intake Manifold Inspection/Replacement|Page 2498 > < Engine - Intake Manifold Inspection/Replacement|Page 2496
Page 8
background image

10. Install the PCV hose (with valve).
11. Install the knock sensor harness electrical connector to the intake manifold.

12. Connect the following electrical connectors:

-

EVAP purge solenoid (1)

-

Knock sensor (2)

-

MAP sensor (3)

-

Main coil (4)

-

Fuel injectors (5)

13. Perform the following steps in order to Connect the fuel injector electrical connectors.

13.1.

Install the connectors to their corresponding injectors to ensure correct reassembly.

13.2.

Connect the fuel injector electrical connector.

13.3.

Push the CPA retainer (2) on the connector in 1 click.

13.4.

Repeat the steps for each injector electrical connector.

Engine - Intake Manifold Inspection/Replacement|Page 2498 > < Engine - Intake Manifold Inspection/Replacement|Page 2496