G 2500 3/4 Ton Van V8-6.5L DSL Turbo VIN F (1996)
Fig. 21 Oil pan installation
11.
Apply 3/16 inch bead of RTV sealer to top and bottom surfaces of new rear pan seal and to each end of seal where it contacts block, and apply
3/16 inch bead of RTV sealer along pan rail inner edge and around all bolt holes,
Fig. 21.
12.
Install pan and rear seal while sealer is still wet. Tighten oil pan bolts to specification.
13.
Reverse remaining procedure to complete installation.
14.
Allow 30 minutes for sealer to cure, fill crankcase to specified capacity and check for leaks.