gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Fluid Filter - A/T > < Instrument Panels - Delamination Condition|Page 546
Page 3
background image

Parts are expected to be available on February 26, 1990. Until then normal part orders will not be accepted by GMSPO. Only verifiable emergency VIP
orders will be accepted. SPO will make every effort to obtain parts. All parts will be placed on 400 control to waive VIP surcharges. However, the part
will be shipped premium transportation at dealers expense. All other order types will be cancelled as incorrectly ordered while the 400 control is in
place. For vehicles repaired under warranty use:

*Labor Operation:     

T8085

Labor Time:

0.2 Hrs. (Add 0. 1 Hr. to paint to match)

*Labor Operation is coded to base vehicle coverage in the warranty system.

Fluid Filter - A/T > < Instrument Panels - Delamination Condition|Page 546