gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 11813 > < Deployment Procedures|Page 11811
Page 6
background image

13. Bend flat the twisted connection.
14. Secure and insulate the connection using electrical tape.

15. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
16. Connect the deployment harness to the Inflatable Restraint Steering Wheel Module yellow 2-way connector.

17. Route the deployment harness out of the vehicle's driver side.

18. Disconnect the Inflatable Restraint Instrument Panel (IP) module yellow 2-way harness connector.
19. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
20.  Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

Deployment Procedures|Page 11813 > < Deployment Procedures|Page 11811