gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

All Technical Service Bulletins for Truck Bed:|88T2210 > < Truck Bed - Front End Panel to Side Panel Rattling|Page 12054
Page 3
background image

^

Reconnect the negative battery cable.

Labor Op T7390 should be used when performing this procedure. Total time to perform this procedure is 2.6 hours. This time includes:

^

1.3 hours to make the repair

^

1.1 hours to refinish top of box (Material Allowance PH)

^

.2 hour to clear coat (Material Allowance CC)

All Technical Service Bulletins for Truck Bed:|88T2210 > < Truck Bed - Front End Panel to Side Panel Rattling|Page 12054