gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 13800 > < Deployment Procedures|Page 13798
Page 9
background image

6. Cut the yellow 2-way harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
7. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

8. Cut two 4.6 m (15 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the driver deployment

harness.

9. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.

10. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the air bag.

11. Twist together one connector wire lead to one deployment wire.
12. Inspect that the previous connection is secure.

13. Bend flat the twisted connection.

Deployment Procedures|Page 13800 > < Deployment Procedures|Page 13798