gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 14048 > < Deployment Procedures
Page 2
background image

8. Place the module with the vinyl trim cover facing up and away from the surface on a work bench.

9. Clear a space on the ground about 85 meters (6 ft) in diameter for deployment of the module. If possible, use a paved, outdoor location free of

activity. Otherwise, use a space free of activity on the shop floor. Make sure you have sufficient ventilation.

10. Make sure no loose or flammable objects are in the area.
11. Place the J 39401-B SIR Deployment Fixture in the center of the cleared area.
12. Fill the fixtures plastic reservoir with water or sand.

13. Mount the module (1) in the SIR deployment fixture (3) with the vinyl trim cover facing up using the following mounting method.

IMPORTANT:  Securely hand tighten all fasteners prior to deployment.

14. To mount, use two M6 x 1.0 nuts (2) with washers in order to secure the module (1) to the fixture (3).

Deployment Procedures|Page 14048 > < Deployment Procedures