gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 11378 > < Deployment Procedures|Page 11376
Page 4
background image

22. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
23. Twist together 1 end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the side impact module.

24. Twist together 1 connector wire lead to 1 deployment wire.
25. Inspect that the previous connection is secure.

26. Bend flat the twisted connection.
27. Secure and insulate the connection using electrical tape.

28. Twist together, bend and tape the remaining connector wire lead to the remaining deployment wire.

Deployment Procedures|Page 11378 > < Deployment Procedures|Page 11376