gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Air Injection Check Valve|Bank 1|Page 5865 > < Air Injection Check Valve|Bank 1|Page 5863
Page 1
background image

Air Injection Check Valve: Service and Repair
Bank 2

REMOVAL PROCEDURE

CAUTION:  Allow the engine to cool before servicing the secondary air injection AIR system in order to reduce the chance of severe burns.

1. Remove the clamps and AIR hoses from the AIR system right pipe.

2. Remove the check valve from the AIR pipe.
3. Remove the right AIR pipe from the exhaust manifold.
4. Before replacing a check valve, test the valve for proper operation.

4.1. Install a vacuum pump to the nipple side of the check valve, AIR pump side.
4.2. Pump the vacuum pump to 10 inches Hg. and observe the gauge.
4.3. Replace the check valve if the vacuum bleeds down to zero within 5 seconds.

INSTALLATION PROCEDURE

NOTE:  Refer to Fastener Notice in Service Precautions.

Air Injection Check Valve|Bank 1|Page 5865 > < Air Injection Check Valve|Bank 1|Page 5863