K 2500 Truck 4WD V8-8.1L VIN G (2001)
1. Install the shut-off valve outlet hose to the crossover pipe.
2. Install the hose clamp at the crossover pipe.
3. Install the hose to the shut-off valve (13).
4. Install the hose clamp (12) to the AIR shut-off valve outlet hose (10).
5. Close the retaining clip (11) for the outlet hose.