gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Brake Pressure Modulator Valve (BPMV) Replacement|Page 9822 > < Brake Pressure Modulator Valve (BPMV) Replacement
Page 2
background image

Notice:  Refer to Fastener Notice in Service Precautions.

3. Install the three Allen bolts (10) that fasten the combination valve (11) to the BPMV (3).

^

Tighten the three Allen bolts to 8 Nm (6 ft. lbs.), then to 16 Nm (12 ft. lbs.).

Important:  Do not use RTV or any other type of sealant on the EBCM gasket or mating surfaces.

4. Install EBCM (2) onto BPMV (3).

Important:  Do not reuse the old mounting bolts. Always install new bolts with the new EBCM.

5. Install the four EBCM bolts (1).

^

Tighten the four bolts to 5 Nm (39 inch lbs.) in a X-pattern.

6. Install BPMV (4) to bracket (6).
7. Install the three BPMV to bracket retaining bolts (8).

^

Tighten the three bolts to 9 Nm (7 ft. lbs.).

8. Connect the four electrical connectors to the EBCM (2).
9. Install the EHCU to the vehicle frame.

^

Tighten the three bolts to 12 Nm (9 ft. lbs.).

10. Install the right front, left front and rear brake pipes to the tube adapters (5). 

^

Tighten the three brake pipe fittings to 30 Nm (22 ft. lbs.).

11. Install the front and rear brake pipes (from master cylinder) to the combination valve (11). 

^

Tighten the three brake pipe fittings to 30 Nm (22 ft. lbs.).

12. Connect the electrical connector (9) to the combination valve (11).
13. Connect the negative battery cable.

Important:  Verify that the combination valve metering rod is depressed during bleeding.

14. Bleed the brake system. Refer to Automated Bleed Procedure.
15. Return to A Diagnostic System Check.

Brake Pressure Modulator Valve (BPMV) Replacement|Page 9822 > < Brake Pressure Modulator Valve (BPMV) Replacement