K Yukon/Denali 4WD V8-5.7L VIN R (2000)
3. Connect the bank 2 AIR pipe.
4. Connect the AIR pump output hose to the AIR valve.
5. Connect the AIR crossover bank 1 hose.
3. Connect the bank 2 AIR pipe.
4. Connect the AIR pump output hose to the AIR valve.
5. Connect the AIR crossover bank 1 hose.