gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 5580 > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 5578
Page 5
background image

8. Install the cooler lines to the vehicle.

9. Install the cooler line into the quick connect fitting.

10. Insert the cooler line end into the quick connect fitting until a click is either heard or felt.

11. Do not use the plastic cap on the cooler line in order to install the cooler line into the fitting.
12. Pull back sharply on the cooler line in order to ensure that the cooler line is fastened into the quick connect fitting.

A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 5580 > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 5578