S15/T15 Sonoma P/U 2WD L4-2.2L VIN 5 Flex Fuel (2001)
Installation Procedure
1. Ensure that the transmission is in the mechanical neutral position.
2. Following the shift cable adjustment procedure, install the shift cable end of the shift cable to the transmission shift lever stud ball.
3. Install the retainer to the shift cable and transmission bracket.
4. Feed the shift cable through the floor panel.
5. Lower the vehicle.
6. Install the tape and grommet on the shift cable to the floor panel.
7. Install the retainer securing the shift cable to the shift controller.
8. Install the console.
9. Install the front mat and carpet.