not functioning. Overheat will eventually occur

c.

Contact the Technical Assistance Center. Arrangements will be made to deliver a set of matched balance shaft drive gears overnight.
Replace the balance shaft drive gears with the ones supplied.

Steps to replace balance shaft gears:

A.

Disconnect battery.

B.

Drain coolant.

C.

Remove fan shroud.

D.

Remove accessory drive belt.

E.

Remove fan.

F.

Remove the water pump.

G.

Remove crankshaft pulley and harmonic balancer.

H.

Remove transmission torque converter cover. Let it lie on top of exhaust crossover pipe.

I.

Drop the oil pan by leaving the rear two nuts on the crankshaft seal studs about 1/4 inch from tight. The two studs will stabilize the oil
pan and the oil will not have to be drained.

J.

Remove the front cover.

K.

It is recommended that the engine be turned over by hand so that the crankshaft and camshaft sprocket timing marks are dot to dot.

L.

Loosen the small diameter balance shaft gear bolt. This is the driven gear and has a TORX drive bolt.

M.

Remove the camshaft sprocket by taking off the lock nut first, then the two bolts.

N.

Remove the large diameter balance shaft (drive) gear.

O.

Remove the small diameter balance shaft driven gear.

P.

Clean all sealing surfaces, removing all old gasket material.

Installation of new matched set balance shaft gears:

A.

Install driven gear and bolt finger tight.

B.

Install and align drive gear dot to dot with timing mark of the driven gear.

C.

Install drive gear stud to 16 N-m (12 ft.lbs.) to ensure the shoulder of the stud is below the counter bore in the gear.

D.

Install camshaft sprocket and chain. Ensure their timing is correct. If the camshaft and crankshaft have not been disturbed, the
crankshaft and camshaft sprockets should be dot to dot.

E.

Install the camshaft sprocket nut and bolts. Torque to 28 N-m (21 ft.lbs.).

F.

Torque driven balance shaft gear bolt to 20 N-m (15 ft.lbs.) plus an additional 35 degrees using special tool J36660.

G.

At this point, the gear change is complete. Follow the removal steps in reverse order to install the remaining components. Consult the
service manual for torque specifications.

Correction For Condition # 2

CORRECTION

2.

The following steps should be followed to diagnose the detonation type rattle noise which occurs between 2000-2500 RPM under load (condition
# 2):

a.

Ensure the ESC (Electronic Spark Control) system is working properly. Refer to the ELECTRONIC SPARK CONTROL section of the