gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 10413 > < Deployment Procedures|Page 10411
Page 7
background image

11. Clear a space on the ground about 1.85 M (6 ft) in diameter for deployment of the module. If possible, use a paved, outdoor location free of

activity. Otherwise, use a space free of activity on the shop floor. Make sure you have sufficient ventilation.

12. Make sure no loose or flammable objects are in the area.
13. Place the module in the space with the vinyl trim cover facing up.

14. Extend the SIR deployment harness and adapter to full length from the module.
15. Place a 12V minimum/2A minimum power source (i.e., vehicle battery) near the shorted end of the harness.

16. Connect the module (1) to the adapter (2) on the SIR deployment harness (3).
17. Firmly seat the adapter into the module connector.
18. Clear the area of people.

CAUTION:  When you are deploying an inflator module for disposal, perform the deployment procedures in the order listed. Failure to follow
the procedures in the order listed may result in personal injury.

Deployment Procedures|Page 10413 > < Deployment Procedures|Page 10411