Savana 1/2 Ton Van V8-5.7L VIN R (2001)
13. Remove the upper intake manifold bolts from the engine and then remove the upper intake manifold (2).
14. Clean all sealing surfaces.
Installation Procedure
Notice: Refer to Fastener Notice in Service Precautions.
Sequence
1. Install the upper intake manifold (2) to the engine.
1.1.
Tighten the upper intake manifold studs on the first pass to 12 Nm (44 inch lbs.).
1.2.
Tighten the upper intake manifold studs on the second pass to 10 Nm (89 inch lbs.).
2. Install the accelerator control cable bracket (3) to the throttle body and the lower intake manifold.